I got the florentine cutaway joint fitted and joined (with a structural epoxy fillet), and the reverse kerfing glued in on the back. Next I’ll do the front side kerfing and neck and tail blocks - then the sides and rim should be a pretty stiff structural unit.

One Response to “Cutaway Fitted and Back Kerfing Done”

So … how’s the ABG coming?

Something to say?